Nuclear technology can help to meet America's growing demand for
reliable, clean, affordable electricity. This has led many
politicians, including presidential candidate John McCain, to
conclude that the nation needs to start building new nuclear plants
now.
The electric power industry has already begun plans to start
building new reactors. While approximately 20 applications have
been filed or are in preparation to build over 30 new reactors, no
permits have been issued and no new plants have begun construction.
A primary reason is that the regulatory process remains arduous and
unknown. To overcome this, Congress should authorize a fast-track
permitting process for a limited number of reactor projects.
A Slow, Arduous Process
The Department of Energy instituted the Nuclear Power 2010
program in 2002 as an effort to address the regulatory and
institutional barriers to new reactors' near-term deployment. As
its name implies, the original time frame called for new reactor
deployment by 2010. Unfortunately, the program has not succeeded in
this regard. Most believe that the earliest that a new plant will
come on line is the latter half of the next decade.
The problem is not technical or economic-new reactors are being
built around the globe, and plans for more are being announced
every month. The problem is political. The Nuclear Regulatory
Commission (NRC), after so many years with no applications for new
reactors, does not have a proven process for efficiently licensing
new reactors. The NRC estimates that it needs a minimum of 42
months to issue the design, site, and construction/operation
licenses required for reactor construction to begin. This
includes-in addition to the safety assessments that are NRC's
primary responsibility-about two years for environmental reviews, a
year for design reviews, and a year for public hearings. And even
this time frame is contingent on complete applications and minimal
opposition from outside interests. This has led for calls to
streamline the process.
Streamlining is necessary because the process cannot just be
sped up. Specific procedures are in place that the NRC must follow,
and that process takes time. Simply adding manpower, as some have
suggested, would only provide marginal benefit. Because training
regulators can take two years, it would be years before the NRC
could hire and train enough people to shorten time schedules.
To speed up the current permitting process, Congress should
authorize a fast-track program that is open to new reactor
applicants that meet certain conditions. The goal would be to cut
by at least 50 percent the amount of time it takes to permit a new
plant. This must be done without sacrificing safety standards or
security.
The lessons learned from the fast-track program could be applied
to necessary regulatory overhauls in the future.
The program's objective would be to reduce the permitting
schedule from four years down to two or less and should be
available for up to two construction permits per reactor
design.
The fast-track program would consist of:
- Focusing NRC Resources. Per congressional direction, the
NRC should focus its resources on permitting designated fast-track
applications as quickly as possible without sacrificing safety or
quality assurance.
- Mobilizing National Laboratory Capabilities. Although
the NRC already uses the national labs to support their activities,
the national labs should be compelled by Congress to organize
themselves to support the fast-track applications.
- Focus University Funding Around Supporting the
Effort. The Department of Energy funds programs that support
nuclear education in the university system. These programs should
be focused on supporting the NRC's fast-track program. This would
not only provide additional resources to fast-tracking permits but
would also develop a workforce with the technical expertise to
design and operate America's reactors.
- Ensuring a Science- and Technical-Based Assessment. The
NRC must have the freedom to pursue a transparent, fact-based
process in a non-adversarial environment. While inputs from local
stakeholders must be accommodated, the NRC must be allowed to make
decisions based on good science and engineering in a timely manner.
This requires an efficient process that allows legitimate concerns
to be heard and resolved without being hijacked by outside,
agenda-driven interests.
Fast-track program applicants would have to meet certain
criteria. These would include:
- NRC Certified or Proven Design. The NRC has already
certified four designs (although one is currently being amended)
and reviewing three others. While only reactors with certified
designs are licensable, applicants with designs that are nearing
completion, especially if those designs are proven elsewhere,
should be eligible for a slightly modified fast-track program that
would include design certification.
- Proven Site with Broad Public Support. The reactor site
must already be licensed for operating reactors, and the applicant
must demonstrate that the new reactor is welcome by the local
community. Furthermore, the applicant must establish that an
additional reactor will be safe and environmentally compatible.
Under such conditions, the NRC should be permitted to provide an
expedited environmental review, which takes roughly two years under
current policy.
- Proven Reactor Owner/Operator. The application must be
submitted by an operator with extensive experience with nuclear
operations and be in good standing with the NRC. This is not to
suggest that some current COL applicants are not capable, but
fast-track applicants must have extensive nuclear operations
experience and credibility with the state and local community. Each
applicant would have to demonstrate its competence to the NRC
before entering the program.
- Proven Demand. The applicant must demonstrate that there
is a market for the power to be produced by the reactor.
- Complete COL (Combined Operations and Construction License)
Application. The applicant must have a full and complete COL
application per NRC guidance. One of the current problems slowing
the NRC is the lack of completeness of some of the applications.
Complete applications are critical to ensuring that the NRC is able
to conduct a comprehensive design and safety review without having
to go back to the applicant for additional information.
- Long-Lead Components Commitment. The applicant must
demonstrate both a financial commitment and a preparedness to
earnestly move forward by securing a source for timely delivery of
long-lead components. Many of the components used to build a
nuclear power plant must be ordered years in advance. Applicants
seeking fast-track permits should be required to place early orders
or deposits as soon as they are granted a fast-track permitting
status.
- Applicant Fees. Like most other NRC activities, industry
should fund most of the activities associated with the fast-track
program through the assessment of a program participation fee.
To execute the program, Congress must:
- Provide Specific Direction to the NRC, National Labs, and
Department of Energy. Congress must explicitly state its
intentions for the fast-track program and make funding contingent
on the NRC, national labs, and DOE to organizing themselves to
achieve the objective of early completion of new reactor
construction.
- Adequately Fund. If Congress is serious about reducing
the time it takes to permit and build new reactors, it must give
NRC, the national labs, and the DOE the resources and regulatory
flexibility they need to get the job done. Rebuilding America's
energy infrastructure is exactly the kind of direction that each of
these institutions should be working toward.
Many Benefits, Few Drawbacks
Many in Congress have begun to realize that the nation's energy,
economic, security, and environmental objectives cannot be met
without nuclear power. This has led to multiple initiatives to
restart the industry in the U.S. Unfortunately, many of these plans
rely heavily on subsidies and are not sustainable. However,
instituting a program to fast-track the notoriously arduous process
of permitting new plants would demonstrate Congress' commitment to
nuclear power and provide the regulatory stability that investors
need to grow the industry. Furthermore, it would provide a common
purpose around which America's energy-related institutions could
organize. And finally, it would provide the information necessary
to bring about comprehensive regulatory reform that the nation
needs for a nuclear renaissance to take hold.
Jack Spencer is Research
Fellow in Nuclear Energy in the Thomas A. Roe Institute for
Economic Policy Studies at The Heritage Foundation.